Commit Graph

15 Commits

Author SHA1 Message Date
Vincent Koc
dac0ef6f0e fix(test): bound Testbox agentic and extension suites (#115696)
* fix(test): split Testbox extension processes

* fix(test): split Testbox agentic processes
2026-07-30 19:26:47 +08:00
Peter Steinberger
6f7edb3695 fix: make auto-review and PR triage fail safely (#114745)
* fix: make auto-review and PR triage fail safely

* test: cover fail-closed PR merge review gates

* fix: preserve GitHub pending-check review semantics
2026-07-27 17:11:28 -04:00
Peter Steinberger
c7dd7b4be2 fix(pr): rebuild stale prep branches after head changes (#112510)
* fix(pr): refresh stale prep branch on head drift

* fix(ci): repair PR landing gate failures
2026-07-21 21:57:56 -07:00
Peter Steinberger
84e54ab264 chore(pr): landing-UX — aggregated validation, lock classes, ci-dispatch, committer guard (#111287)
* chore(pr): landing-UX — aggregate artifact validation, lock classes, ci-dispatch, committer worktree guard

* fix(pr): CI lane cleanup for landing-ux — lint causes, hermetic tests, private helpers

* chore(deadcode): register pr-lib CLI entries in knip config
2026-07-19 02:09:55 -07:00
Peter Steinberger
76a236da5f fix(ci): harden release validation gates (#108798)
* fix(ci): harden release validation gates

* fix(apns): keep tombstones in strict SQLite schema

* fix(ci): isolate PR publication transport
2026-07-16 03:21:08 -07:00
Peter Steinberger
9cdc0c3495 test: tighten async polling intervals (#108301) 2026-07-15 06:14:54 -07:00
Peter Steinberger
85963a2d58 fix(pr): preserve signed merge commits (#108112) 2026-07-15 00:41:18 -07:00
Peter Steinberger
2e73cff6ca fix(maint): keep PR maintenance delta-only (#108018)
* fix(maint): keep fork prep sync delta-only

* fix(ci): use exact merge parent for PR diffs

* fix(ci): pass docs diff base through environment

* test(ci): cover environment-mediated docs base
2026-07-14 22:49:33 -07:00
Peter Steinberger
a63aec8bf8 test: remove more avoidable waits (#105816) 2026-07-12 18:24:13 -07:00
Vincent Koc
f7e0a6147c refactor(pr): centralize prepare gate planning (#104961) 2026-07-12 12:32:20 +08:00
Peter Steinberger
1c4041bf72 fix(maint): reuse docs-only parent gate evidence (#104696) 2026-07-11 13:49:01 -07:00
Peter Steinberger
4cb9cc689e fix(maint): avoid stale PR sync evidence (#103944) 2026-07-10 22:05:23 +01:00
Vincent Koc
0c38082c6d fix(maint): use canonical hosted gate verifier 2026-07-06 01:18:19 -07:00
Peter Steinberger
5d9cec16f3 fix(maint): reuse recent hosted gates after rebase (#100663)
* fix(maint): reuse recent hosted gates after rebase

* fix(maint): preserve whitespace in gate fingerprints
2026-07-06 07:43:03 +01:00
Peter Steinberger
14eb460dd2 feat(scripts): serialize pr prepare gates and add remote Testbox test gate (#100242)
* feat(scripts): serialize pr prepare gates and add remote testbox test gate

Concurrent scripts/pr gate runs across .worktrees queued on the shared
heavy-check lock mid-test: the queued run's children hit the 10-minute
lock timeout while its unlocked build stage piled CPU load onto the
holder's vitest shards, which then stalled past the 120s no-output
watchdog and were SIGTERMed with zero real test failures (observed
landing PRs #99935/#100026 on a loaded maintainer Mac).

- scripts/pr-gates-lock.mjs holds the shared heavy-check lock for the
  whole local gate block; gate stages inherit the existing *_LOCK_HELD
  child contract, so concurrent gate runs now queue as whole units
  before their first command.
- OPENCLAW_PR_GATES_REMOTE=testbox runs the full-suite pnpm test gate on
  a Blacksmith Testbox via scripts/crabbox-wrapper.mjs (same delegation
  as check:changed). The tbx_ lease id and Actions run URL from the
  crabbox --timing-json report are recorded in .local/gates.env
  (REMOTE_GATES_*) and .local/prep.md. Local remains the default;
  pnpm build/check stay local.

Formatting verified with the primary checkout's oxfmt (hook bypassed:
linked worktree has no hydrated node_modules).

* fix(scripts): refresh the gate stamp when lease-retry gates rerun for a rebased head

The lease-retry path reran build/check/test for the rebased prep head but
left .local/gates.env describing the pre-push head, so prep.md/prep.env
attributed stale evidence (including the new remote testbox lease id) to
the pushed commit. Extract write_gates_env_stamp as the single stamp
writer, rewrite the stamp from the retry path for all modes, and re-source
gates.env in prepare_push after the push settles.

Found by autoreview (codex/gpt-5.5); formatting verified with the primary
checkout's oxfmt (hook bypassed: linked worktree has no node_modules).

* fix(scripts): harden remote PR gate evidence

* fix(scripts): serialize complete gate setup

* fix(scripts): clear stale docs gate proof
2026-07-05 04:23:58 -07:00