Summary:
- The PR changes Gateway reload planning, CLI plugin install-index writes, plugin runtime/cache cleanup, docs, changelog, and tests so plugin enable/disable hot reloads while install/update/uninstall stay restart-backed.
- Reproducibility: yes. The earlier blocker has a source-level reproduction: run an external plugin install/up ... watches config and only the managed plugin index changes; the PR now tests that path and queues a restart.
ClawSweeper fixups:
- Included follow-up commit: fix: hot reload plugin management changes
- Included follow-up commit: fix(clawsweeper): address review for automerge-openclaw-openclaw-7597…
- Ran the ClawSweeper repair loop before final review.
Validation:
- ClawSweeper review passed for head 860594f722.
- Required merge gates passed before the squash merge.
Prepared head SHA: 860594f722
Review: https://github.com/openclaw/openclaw/pull/75976#issuecomment-4363168379
Co-authored-by: Peter Steinberger <steipete@gmail.com>
Co-authored-by: clawsweeper <274271284+clawsweeper[bot]@users.noreply.github.com>
Add Control UI timing attribution for tab visibility, refresh phases, secondary refresh groups, and gateway RPCs. Decouple slow Overview, Cron, and Nodes secondary refreshes from primary tab feedback, and report Cron runs timing from the controller's real ok/error/skipped load outcome.
Also keeps telemetry secret-safe by excluding request params and response bodies, adds focused regression coverage for RPC attribution and stale/failed background refreshes, and carries the latest-main Discord test fixture correction needed for check:test-types.
Fixes#64004.